{"id":81453,"date":"2026-10-01T17:49:19","date_gmt":"2026-10-01T10:49:19","guid":{"rendered":"https:\/\/maisonoffice.vn\/en\/?p=81453"},"modified":"2026-10-01T17:50:57","modified_gmt":"2026-10-01T10:50:57","slug":"detailed-office-inspection-checklist-for-leasing","status":"publish","type":"post","link":"https:\/\/maisonoffice.vn\/en\/guide\/detailed-office-inspection-checklist-for-leasing\/","title":{"rendered":"Detailed Office Inspection Checklist for Leasing"},"content":{"rendered":"<p>When inspecting office space for lease, a business should review seven groups of criteria: location; the building and shared infrastructure; actual area; technical systems; security and building management; costs beyond base rent; and legal and lease matters. Actual area, additional costs and early-termination provisions are the three areas most often missed. Every shortlisted building should be scored using the same form and inspected at least once during peak hours.<\/p>\n<h2>1. What should a business prepare before an office inspection?<\/h2>\n<p>Set the budget, headcount and area requirement before visiting an office. Without these inputs, the inspection can become a subjective tour in which the viewer is unduly influenced by how the premises are presented.<\/p>\n<p>Before the inspection, prepare:<\/p>\n<ul>\n<li><strong>Maximum monthly occupancy budget: <\/strong>Include service charges and value-added tax (VAT).<\/li>\n<li><strong>Workforce plan: <\/strong>Record current headcount and the expected workforce over the next two to three years.<\/li>\n<li><strong>Mandatory requirements: <\/strong>Examples include electrical load, parking allocation and after-hours access.<\/li>\n<li><strong>Questions for the landlord: <\/strong>Use one written list for every building.<\/li>\n<li><strong>Scoring sheet: <\/strong>Bring a printed form or a mobile version that can be completed on site.<\/li>\n<\/ul>\n<p>Once the criteria are clear, plan how many properties to inspect, when to visit and who should attend. This makes the information more complete and easier to compare.<\/p>\n<ul>\n<li><strong>Number of buildings: <\/strong>Shortlist three to five buildings that already meet the budget and location requirements. This creates a useful comparison without consuming unnecessary time.<\/li>\n<li><strong>Inspection times: <\/strong>Visit once during business hours to observe normal operations and once during the morning or afternoon peak to assess traffic and lift queues. If the business works late, inspect the building in the evening as well.<\/li>\n<li><strong>Inspection team: <\/strong>Include an administration representative, an IT representative and the budget decision-maker because each person will focus on different risks.<\/li>\n<li><strong>Equipment: <\/strong>Bring a laser measure, a phone with an internet-speed testing application, and a camera or phone to record the premises.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-81469\" src=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-3.jpg\" alt=\"What should a business prepare before an office inspection?\" width=\"1000\" height=\"667\" srcset=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-3.jpg 1000w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-3-360x240.jpg 360w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-3-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<h2>2. Office inspection checklist covering seven assessment groups<\/h2>\n<p>To compare several options fairly, evaluate every building against the same criteria. For each group, record the inspection item, actual result and priority instead of marking only pass or fail.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"192\"><strong>Assessment group<\/strong><\/td>\n<td width=\"365\"><strong>What to inspect<\/strong><\/td>\n<td width=\"115\"><strong>Reference weight<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"192\">Costs beyond base rent<\/td>\n<td width=\"365\">Service charge, VAT, after-hours fees, parking and deposit<\/td>\n<td width=\"115\">20%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Actual area<\/td>\n<td width=\"365\">Usable area, floor-plate shape and columns<\/td>\n<td width=\"115\">15%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Technical systems<\/td>\n<td width=\"365\">Air-conditioning, electrical load, internet and fire safety<\/td>\n<td width=\"115\">15%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Legal documents and lease<\/td>\n<td width=\"365\">Building documents, leasing conditions and contract terms<\/td>\n<td width=\"115\">15%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Location and transport<\/td>\n<td width=\"365\">Access, connectivity and peak-hour traffic<\/td>\n<td width=\"115\">15%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Building and shared infrastructure<\/td>\n<td width=\"365\">Lifts, parking, lobby and management company<\/td>\n<td width=\"115\">10%<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Security and operations<\/td>\n<td width=\"365\">Access control, cleaning, maintenance and incident response<\/td>\n<td width=\"115\">10%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>These weights are a reference for standardising the comparison. A technology company may place more weight on technical systems, while a client-facing business may increase the location weighting.<\/p>\n<h3>2.1 Location and transport<\/h3>\n<p>Assess the location by the real accessibility experienced by employees, clients and partners. A central address is not necessarily convenient if congestion is frequent, drop-off is difficult or vehicle access is restricted during peak periods. Inspect major routes, traffic direction and connections to the areas from which employees regularly travel.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"206\"><strong>Criterion<\/strong><\/td>\n<td width=\"331\"><strong>How to check<\/strong><\/td>\n<td width=\"134\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"206\">Peak-hour commute<\/td>\n<td width=\"331\">Test from areas with a high concentration of employees<\/td>\n<td width=\"134\">\u2026 minutes<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Connections to major roads<\/td>\n<td width=\"331\">Review the map and inspect in person<\/td>\n<td width=\"134\">Road names<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Client access<\/td>\n<td width=\"331\">Test from areas frequently used by clients and partners<\/td>\n<td width=\"134\">\u2026 minutes<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">One-way roads or vehicle restrictions<\/td>\n<td width=\"331\">Observe and verify on site<\/td>\n<td width=\"134\">Yes \/ No<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Public transport<\/td>\n<td width=\"331\">Identify the nearest bus stop, station or terminal<\/td>\n<td width=\"134\">\u2026 metres<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>After confirming access, inspect the quality of the building\u2019s internal infrastructure because it directly affects employees\u2019 daily operations.<\/p>\n<h3>2.2 Building and shared infrastructure<\/h3>\n<p>Shared infrastructure should be tested for practical capacity rather than judged by the appearance of the fa\u00e7ade or lobby. Lifts, parking, reception and management capability all affect the office experience. For final shortlisted buildings, revisit at a busy time to test lift and parking capacity.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"197\"><strong>Criterion<\/strong><\/td>\n<td width=\"341\"><strong>How to check<\/strong><\/td>\n<td width=\"134\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"197\">Lifts<\/td>\n<td width=\"341\">Record the number, capacity and waiting time<\/td>\n<td width=\"134\">\u2026 lifts \/ \u2026 minutes<\/td>\n<\/tr>\n<tr>\n<td width=\"197\">Motorbike and car parking<\/td>\n<td width=\"341\">Ask how many spaces can be allocated<\/td>\n<td width=\"134\">\u2026 spaces<\/td>\n<\/tr>\n<tr>\n<td width=\"197\">Parking charges<\/td>\n<td width=\"341\">Request the current tariff<\/td>\n<td width=\"134\">\u2026 VND\/vehicle\/month<\/td>\n<\/tr>\n<tr>\n<td width=\"197\">Lobby and reception<\/td>\n<td width=\"341\">Observe the condition and visitor-handling capacity<\/td>\n<td width=\"134\">Notes<\/td>\n<\/tr>\n<tr>\n<td width=\"197\">Management company<\/td>\n<td width=\"341\">Confirm the operator and its scope<\/td>\n<td width=\"134\">Company name<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>If shared infrastructure meets the requirement, inspect the leased premises to determine whether the space is genuinely suitable for the workforce and operating model.<\/p>\n<h3>2.3 Actual area and physical space<\/h3>\n<p>The floor area in the quotation must be understood using the building\u2019s measurement method. Ask the landlord to define the chargeable area, private-use area and any allocation of common areas.<\/p>\n<ul>\n<li><strong>Centre-line area: <\/strong>Measured to the centre line of enclosing or dividing walls under the applicable method.<\/li>\n<li><strong>Clear internal area: <\/strong>The space within the surfaces surrounding the usable premises.<\/li>\n<li><strong>Net or usable area: <\/strong>The area defined as the tenant\u2019s private-use space under the building\u2019s measurement approach.<\/li>\n<\/ul>\n<p>Depending on the building, rent may be charged on Net area or Gross area that includes an allocation of common space. Confirm the loading factor and record it in the lease.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"187\"><strong>Criterion<\/strong><\/td>\n<td width=\"341\"><strong>How to check<\/strong><\/td>\n<td width=\"144\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"187\">Quoted area<\/td>\n<td width=\"341\">Request written confirmation<\/td>\n<td width=\"144\">\u2026 sqm<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Measurement method<\/td>\n<td width=\"341\">Clarify how the area is measured and charged<\/td>\n<td width=\"144\">Centre line \/ clear internal \/ Net \/ other<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Floor dimensions<\/td>\n<td width=\"341\">Measure approximately or compare with the floor plan<\/td>\n<td width=\"144\">\u2026<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Floor-plate shape<\/td>\n<td width=\"341\">Assess the layout potential<\/td>\n<td width=\"144\">Square \/ long \/ irregular<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Columns and service risers<\/td>\n<td width=\"341\">Count positions that affect the layout<\/td>\n<td width=\"144\">\u2026 positions<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Finished ceiling height<\/td>\n<td width=\"341\">Confirm the final clear height<\/td>\n<td width=\"144\">\u2026 metres<\/td>\n<\/tr>\n<tr>\n<td width=\"187\">Natural light<\/td>\n<td width=\"341\">Review orientation and glazed frontage<\/td>\n<td width=\"144\">Notes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Area requirements should reflect headcount, meeting rooms, management rooms, pantry and growth during the lease. Use an appropriate <a href=\"https:\/\/maisonoffice.vn\/en\/news\/standard-office-size-for-one-person\/\">office size standard<\/a> and distinguish <a href=\"https:\/\/maisonoffice.vn\/en\/news\/gross-floor-area\/\">Net area from Gross floor area<\/a> before comparing quotations.<\/p>\n<h3>2.4 Technical systems<\/h3>\n<p>After the floor plate meets the area requirement, inspect the technical systems because many deficiencies are difficult to correct after signing and fit-out. An IT or technical representative should attend the final inspection where the business has substantial server, electrical, after-hours or backup-connectivity requirements.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\"><strong>Criterion<\/strong><\/td>\n<td style=\"width: 49.9398%;\" width=\"341\"><strong>How to check<\/strong><\/td>\n<td style=\"width: 19.9759%;\" width=\"134\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Air-conditioning system<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Confirm the type and service coverage<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">System type<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Air-conditioning hours<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Confirm standard hours and overtime charges<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">From \u2026 to \u2026<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Electrical load<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Request the capacity supplied to the leased area<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">\u2026 kW<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Ability to increase load<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Ask about conditions and costs<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">Yes \/ No<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Internet and telecommunications<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Confirm network operators with installed infrastructure<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">\u2026 operators<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Fire prevention and firefighting<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Review relevant information and documents within the applicable scope<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">Notes<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 29.1215%;\" width=\"197\">Emergency exits<\/td>\n<td style=\"width: 49.9398%;\" width=\"341\">Locate exits and compare with the evacuation plan<\/td>\n<td style=\"width: 19.9759%;\" width=\"134\">\u2026 locations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>For connectivity, verify network operators, cable-routing capability and a backup-line option rather than relying solely on Wi-Fi speed during the visit. Extend the review from technical infrastructure to day-to-day building operations, especially security, cleaning and incident response.<\/p>\n<h3>2.5 Security amenities and building management<\/h3>\n<p>Building-management quality is most visible in daily operating procedures. Review visitor access, security rosters, cleaning of common areas and the incident-reporting process. Ask management for specific information on issues that can directly affect operations.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"192\"><strong>Criterion<\/strong><\/td>\n<td width=\"341\"><strong>How to check<\/strong><\/td>\n<td width=\"139\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"192\">Access control<\/td>\n<td width=\"341\">Observe access cards, security staff and CCTV<\/td>\n<td width=\"139\">Notes<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">After-hours security<\/td>\n<td width=\"341\">Confirm night and weekend coverage<\/td>\n<td width=\"139\">Yes \/ No<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Cleaning of common areas<\/td>\n<td width=\"341\">Inspect corridors, washrooms and lobby<\/td>\n<td width=\"139\">Meets requirement \/ Clarify<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Incident response<\/td>\n<td width=\"341\">Ask for the procedure and reporting contact<\/td>\n<td width=\"139\">\u2026 hours \/ contact<\/td>\n<\/tr>\n<tr>\n<td width=\"192\">Employee amenities<\/td>\n<td width=\"341\">Review food and beverage, rest areas and nearby services<\/td>\n<td width=\"139\">Notes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Once operating capability is assessed, translate each technical and service item into cost. A building with a low base rent can still exceed the budget when its total monthly occupancy cost is calculated.<\/p>\n<h3>2.6 Costs beyond base rent<\/h3>\n<p>The quoted rent does not represent the full budget throughout occupancy. Convert every option into the same monthly total-cost scope. The quotation should state each charge, unit and condition.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"178\"><strong>Cost item<\/strong><\/td>\n<td width=\"341\"><strong>What to confirm<\/strong><\/td>\n<td width=\"154\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"178\">Base rent<\/td>\n<td width=\"341\">Unit rate and included items<\/td>\n<td width=\"154\">\u2026 USD or VND\/sqm\/month<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">Service charge<\/td>\n<td width=\"341\">Rate and adjustment cycle<\/td>\n<td width=\"154\">\u2026\/sqm\/month<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">VAT<\/td>\n<td width=\"341\">Applicable tax rate<\/td>\n<td width=\"154\">\u2026%<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">After-hours air-conditioning<\/td>\n<td width=\"341\">Unit rate and calculation method<\/td>\n<td width=\"154\">\u2026\/hour<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">Parking<\/td>\n<td width=\"341\">Rates and vehicle allocation<\/td>\n<td width=\"154\">\u2026\/vehicle\/month<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">Deposit<\/td>\n<td width=\"341\">Number of months and refund conditions<\/td>\n<td width=\"154\">\u2026 months<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">Electrical-load upgrade<\/td>\n<td width=\"341\">Conditions and cost if required<\/td>\n<td width=\"154\">Notes<\/td>\n<\/tr>\n<tr>\n<td width=\"178\">Reinstatement<\/td>\n<td width=\"341\">Handback standard and end-of-term responsibility<\/td>\n<td width=\"154\">Notes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>When comparing buildings, convert regular charges into one monthly figure. Review <a href=\"https:\/\/maisonoffice.vn\/en\/news\/office-rental-service-fees\/\">office rental service fees<\/a>, <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/overtime-office-usage-fee\/\">overtime office usage fees<\/a> and other <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/hidden-costs-office-in-vietnam\/\">hidden office leasing costs<\/a> on the same basis.<\/p>\n<h3>2.7 Legal documents and lease terms<\/h3>\n<p>Before paying a deposit or signing, verify the landlord\u2019s legal capacity and the documents supporting the right to lease in the relevant circumstances. The internal legal team or a qualified adviser should confirm the required document list.<\/p>\n<ul>\n<li><strong>Rights over the property: <\/strong>Documents supporting ownership, use rights or lawful authority to lease.<\/li>\n<li><strong>Building documents: <\/strong>Legal documentation relevant to the property and the transaction scope.<\/li>\n<li><strong>Contracting party: <\/strong>Corporate and signatory information for the party executing the lease.<\/li>\n<li><strong>Authority: <\/strong>A valid authorisation document if the person or entity dealing with the tenant is not the direct contracting party.<\/li>\n<\/ul>\n<table style=\"width: 100%; height: 392px;\">\n<thead>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\"><strong>Lease term<\/strong><\/td>\n<td style=\"height: 56px;\" width=\"350\"><strong>What to check<\/strong><\/td>\n<td style=\"height: 56px;\" width=\"144\"><strong>Record<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Lease duration<\/td>\n<td style=\"height: 56px;\" width=\"350\">Minimum term and renewal conditions<\/td>\n<td style=\"height: 56px;\" width=\"144\">\u2026 years<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Rent adjustment<\/td>\n<td style=\"height: 56px;\" width=\"350\">Increase and adjustment cycle<\/td>\n<td style=\"height: 56px;\" width=\"144\">\u2026% \/ period<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Early termination<\/td>\n<td style=\"height: 56px;\" width=\"350\">Notice, deposit treatment and penalties, if any<\/td>\n<td style=\"height: 56px;\" width=\"144\">Notes<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Premises handover<\/td>\n<td style=\"height: 56px;\" width=\"350\">Initial handover standard<\/td>\n<td style=\"height: 56px;\" width=\"144\">Notes<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Reinstatement<\/td>\n<td style=\"height: 56px;\" width=\"350\">Obligations at lease expiry<\/td>\n<td style=\"height: 56px;\" width=\"144\">Notes<\/td>\n<\/tr>\n<tr style=\"height: 56px;\">\n<td style=\"height: 56px;\" width=\"178\">Repairs and maintenance<\/td>\n<td style=\"height: 56px;\" width=\"350\">Allocation between landlord and tenant<\/td>\n<td style=\"height: 56px;\" width=\"144\">Notes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Prepare the <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/documents-required-for-leasing-office-in-vietnam\/\">documents required for office leasing in Vietnam<\/a> and compare the commercial proposal with the final <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/office-lease-agreement-vietnam\/\">office lease agreement<\/a>.<\/p>\n<h2>3. How to score and compare several buildings<\/h2>\n<p>Score each assessment group from 1 to 5 and multiply the score by its weight. The formula is: total score = \u03a3 (group score \u00f7 5 \u00d7 group weight), with a maximum of 100.<\/p>\n<p>Illustrative example for three hypothetical buildings:<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"226\"><strong>Group<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"96\"><strong>Weight<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"115\"><strong>Building A<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"115\"><strong>Building B<\/strong><\/td>\n<td style=\"text-align: center;\" width=\"115\"><strong>Building C<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"226\">Cost<\/td>\n<td style=\"text-align: center;\" width=\"96\">20%<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<td style=\"text-align: center;\" width=\"115\">2<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Area<\/td>\n<td style=\"text-align: center;\" width=\"96\">15%<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">5<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Technical systems<\/td>\n<td style=\"text-align: center;\" width=\"96\">15%<\/td>\n<td style=\"text-align: center;\" width=\"115\">5<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Legal and lease matters<\/td>\n<td style=\"text-align: center;\" width=\"96\">15%<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<td style=\"text-align: center;\" width=\"115\">5<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Location<\/td>\n<td style=\"text-align: center;\" width=\"96\">15%<\/td>\n<td style=\"text-align: center;\" width=\"115\">5<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Building and infrastructure<\/td>\n<td style=\"text-align: center;\" width=\"96\">10%<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Security and operations<\/td>\n<td style=\"text-align: center;\" width=\"96\">10%<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<td style=\"text-align: center;\" width=\"115\">3<\/td>\n<td style=\"text-align: center;\" width=\"115\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"226\">Total score<\/td>\n<td style=\"text-align: center;\" width=\"96\">100%<\/td>\n<td style=\"text-align: center;\" width=\"115\">82<\/td>\n<td style=\"text-align: center;\" width=\"115\">70<\/td>\n<td style=\"text-align: center;\" width=\"115\">72<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>In this example, Building A ranks highest because of its location and technical systems even though its cost score is only average. Building B performs well on cost but scores lower on operations and floor-space criteria.<\/p>\n<p>Adjust the weights to the business model:<\/p>\n<ul>\n<li><strong>Technology companies and contact centres: <\/strong>Prioritise electrical load, internet, air-conditioning and after-hours operation.<\/li>\n<li><strong>Client-facing companies: <\/strong>Increase the weight for location, building image and reception.<\/li>\n<li><strong>Cost-controlled occupiers: <\/strong>Increase the weight for total occupancy cost and commercial terms.<\/li>\n<li><strong>Growing companies: <\/strong>Prioritise area, expansion capacity and floor-plate flexibility.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-81470\" src=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-4.jpg\" alt=\"How to score and compare several buildings\" width=\"1000\" height=\"667\" srcset=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-4.jpg 1000w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-4-360x240.jpg 360w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-4-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>The score supports the decision but does not replace verification. The right to lease, legal documentation, fire safety and mandatory technical requirements should be checked separately before negotiations proceed.<\/p>\n<h2>4. What should a business ask the landlord and building management?<\/h2>\n<p>Ask specific questions about items that affect cost, operations or the lease, and record the answers in writing. This reduces inconsistencies between the inspection, quotation and final agreement.<\/p>\n<ul>\n<li><strong>Rent and costs: <\/strong>Does the rent include service charges and VAT? What does the service charge include? Can it change? How is after-hours air-conditioning charged? How many parking spaces are allocated? Which fit-out or operating charges can arise?<\/li>\n<li><strong>Technical systems: <\/strong>What electrical capacity is supplied? Can it be increased? Which network operators are installed? What are the air-conditioning hours? What does backup power serve? What fire-safety requirements apply to layout changes and fit-out?<\/li>\n<li><strong>Operations: <\/strong>What are the building hours? How is overtime registered? How are visitors registered? Who handles incidents? When may furniture moves and fit-out work take place?<\/li>\n<li><strong>Lease: <\/strong>What is the minimum term? When and how does rent change? What are the renewal conditions? What obligations apply on early termination? What is the reinstatement standard? How are repair responsibilities divided?<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-81471\" src=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-5.jpg\" alt=\"What should a business ask the landlord and building management?\" width=\"1000\" height=\"562\" srcset=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-5.jpg 1000w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-5-360x202.jpg 360w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-5-768x432.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<h2>5. Common mistakes during an office inspection<\/h2>\n<p>Inspection errors often arise because different buildings are assessed using different standards. One option may be judged on price while another is judged mainly on location or image. A single checklist reduces this bias and highlights matters that still require verification.<\/p>\n<table style=\"width: 100%;\">\n<thead>\n<tr>\n<td width=\"202\"><strong>Mistake<\/strong><\/td>\n<td width=\"269\"><strong>Potential risk<\/strong><\/td>\n<td width=\"221\"><strong>Corrective action<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"202\">Comparing only base rent<\/td>\n<td width=\"269\">Service and operating charges are missed<\/td>\n<td width=\"221\">Compare total occupancy cost<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Relying only on quoted area<\/td>\n<td width=\"269\">The usable layout may not meet the requirement<\/td>\n<td width=\"221\">Verify the measurement method and floor plan<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Inspecting at only one time<\/td>\n<td width=\"269\">Peak-hour traffic and lift conditions remain unknown<\/td>\n<td width=\"221\">Revisit at the relevant time<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Ignoring technical systems<\/td>\n<td width=\"269\">Electrical, internet or cooling problems arise later<\/td>\n<td width=\"221\">Include IT or technical staff when required<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Not recording information on site<\/td>\n<td width=\"269\">Data is confused between buildings<\/td>\n<td width=\"221\">Use one inspection form<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Viewing only one option<\/td>\n<td width=\"269\">There is insufficient evidence for comparison and negotiation<\/td>\n<td width=\"221\">Shortlist several viable options<\/td>\n<\/tr>\n<tr>\n<td width=\"202\">Skimming the lease terms<\/td>\n<td width=\"269\">Renewal or reinstatement problems emerge later<\/td>\n<td width=\"221\">s carefully<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>For shortlisted options, maintain three lists: confirmed, requiring confirmation and requiring negotiation. This separates verified information from points still under discussion.<\/p>\n<h2>6. When should a business use an office inspection adviser?<\/h2>\n<p>A business can organise its own inspection when the requirement is simple and the internal team has relevant experience. Specialist support is useful when there are many options or complex technical requirements because it can standardise the data and reduce processing time.<\/p>\n<p>Consider using an adviser when the business:<\/p>\n<ul>\n<li><strong>Commits significant area or term: <\/strong>The financial and operational exposure is material.<\/li>\n<li><strong>Leases for the first time or relocates its headquarters: <\/strong>The team may lack comparable transaction experience.<\/li>\n<li><strong>Needs to inspect many buildings quickly: <\/strong>The adviser can coordinate viewings and use one comparison format.<\/li>\n<li><strong>Has specialist operating requirements: <\/strong>Examples include high electrical load, resilient internet, security or overtime work.<\/li>\n<li><strong>Needs a total-cost comparison: <\/strong>All options can be placed on the same commercial basis.<\/li>\n<li><strong>Needs support with quotations and negotiations: <\/strong>Unclear costs and conditions can be identified before commitment.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-81467\" src=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-1.jpg\" alt=\"Maison Office\" width=\"1000\" height=\"667\" srcset=\"https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-1.jpg 1000w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-1-360x240.jpg 360w, https:\/\/maisonoffice.vn\/en\/wp-content\/uploads\/2026\/10\/office-inspection-checklist-for-leasing-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p>Maison Office supports requirement definition, building shortlisting, inspection scheduling, quotation consolidation and option comparison. After the shortlist is agreed, the advisory team can help clarify costs and commercial conditions for negotiation with the landlord.<\/p>\n<h2>7. What should a business do after inspecting the office?<\/h2>\n<p>After the inspections, consolidate and score every building using the same criteria, focusing on area, cost, technical systems, operating conditions and lease terms. Record unclear information separately and request written confirmation from the landlord or building management.<\/p>\n<p>Reduce the list to one to three viable options and compare total occupancy cost, layout capacity, commercial terms and unresolved issues before negotiation.<\/p>\n<p>Recommended sequence: Consolidate data \u2192 Score the options \u2192 Select the preferred buildings \u2192 Obtain leasing proposals \u2192 Calculate total cost \u2192 Clarify terms \u2192 Negotiate \u2192 Review the lease.<\/p>\n<p>Classify the information for each preferred option as:<\/p>\n<ul>\n<li><strong>Confirmed: <\/strong>Supported by documents or written evidence.<\/li>\n<li><strong>Requiring confirmation: <\/strong>Missing or unclear cost, technical, legal or operating information.<\/li>\n<li><strong>Requiring negotiation: <\/strong>Rent, rent-free period, escalation, renewal, early termination and other commercial terms.<\/li>\n<\/ul>\n<p>Proceed to negotiation and contract review only after material information has been clarified. Compare the lease against the quotation, leasing proposal and earlier written discussions to identify discrepancies before signing.<\/p>\n<p>The next steps should follow a structured <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/effective-office-leasing-process\/\">office leasing process<\/a> and a checklist of <a href=\"https:\/\/maisonoffice.vn\/en\/guide\/essential-tasks-when-renting-a-new-office\/\">essential tasks when renting a new office<\/a>.<\/p>\n<h2>8. Frequently asked questions<\/h2>\n<h3>8.1 How long does an office inspection take?<\/h3>\n<p>A preliminary inspection usually takes 30\u201360 minutes per building. An office with complex technical or legal requirements may need one or two additional sessions. Allow time for a second visit during peak hours.<\/p>\n<h3>8.2 How many buildings should a business inspect before deciding?<\/h3>\n<p>Inspect at least three buildings to compare price, area and lease conditions. Viewing more than five can dilute the criteria and delay the decision. Pre-filter by budget and location so every visit is commercially viable.<\/p>\n<h3>8.3 How much space is required for an office with 20 to 50 employees?<\/h3>\n<p>The required area depends on workstation density, meeting rooms, management rooms, pantry and workforce growth. Estimate the range from the operating model before beginning inspections rather than applying one universal figure.<\/p>\n<h3>8.4 How can a tenant confirm that the office area matches the quotation?<\/h3>\n<p>Ask for the measurement method and compare the quoted figure with the landlord\u2019s floor plan. A laser measure can provide an approximate on-site check. Confirm the chargeable area and any common-area allocation in writing before signing.<\/p>\n<h3>8.5 Which legal documents should be checked for an office building?<\/h3>\n<p>Verify the landlord\u2019s identity and authority, the right to lease and relevant building documents within the transaction scope. If the signatory or representative does not directly hold the leasing right, clarify the authorisation. A legal team or qualified professional should confirm the final document list.<\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How long does an office inspection take?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"A preliminary inspection usually takes 30\u201360 minutes per building. An office with complex technical or legal requirements may need one or two additional sessions. Allow time for a second visit during peak hours.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How many buildings should a business inspect before deciding?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Inspect at least three buildings to compare price, area and lease conditions. Viewing more than five can dilute the criteria and delay the decision. Pre-filter by budget and location so every visit is commercially viable.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How much space is required for an office with 20 to 50 employees?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"The required area depends on workstation density, meeting rooms, management rooms, pantry and workforce growth. Estimate the range from the operating model before beginning inspections rather than applying one universal figure.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How can a tenant confirm that the office area matches the quotation?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Ask for the measurement method and compare the quoted figure with the landlord\u2019s floor plan. A laser measure can provide an approximate on-site check. Confirm the chargeable area and any common-area allocation in writing before signing.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Which legal documents should be checked for an office building?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Verify the landlord\u2019s identity and authority, the right to lease and relevant building documents within the transaction scope. If the signatory or representative does not directly hold the leasing right, clarify the authorisation. A legal team or qualified professional should confirm the final document list.\"\n      }\n    }\n  ]\n}\n<\/script><\/p>\n\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-right kksr-valign-bottom\"\n    data-payload='{&quot;align&quot;:&quot;right&quot;,&quot;id&quot;:&quot;81453&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;bottom&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;0&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;0&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;5&quot;,&quot;greet&quot;:&quot;Rate this post&quot;,&quot;legend&quot;:&quot;0\\\/5 - (0 votes)&quot;,&quot;size&quot;:&quot;20&quot;,&quot;title&quot;:&quot;Detailed Office Inspection Checklist for Leasing&quot;,&quot;width&quot;:&quot;0&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 0px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 5px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 16px;\">\n            <span class=\"kksr-muted\">Rate this post<\/span>\n    <\/div>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading Time: <\/span> <span class=\"rt-time\"> 10<\/span> <span class=\"rt-label rt-postfix\">minutes<\/span><\/span>When inspecting office space for lease, a business should review seven groups of criteria: location; the building and shared infrastructure; actual area; technical systems; security and building management; costs beyond base rent; and legal and lease matters. Actual area, additional costs and early-termination provisions are the three areas most often missed. Every shortlisted building should [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":81468,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[768],"tags":[],"class_list":["post-81453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-guide"],"acf":[],"_links":{"self":[{"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/posts\/81453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/comments?post=81453"}],"version-history":[{"count":4,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/posts\/81453\/revisions"}],"predecessor-version":[{"id":81473,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/posts\/81453\/revisions\/81473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/media\/81468"}],"wp:attachment":[{"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/media?parent=81453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/categories?post=81453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maisonoffice.vn\/en\/wp-json\/wp\/v2\/tags?post=81453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}